Floor Socket Barrier

Extrait du fichier (au format texte) :

Instructions - Floor Socket Barrier

Barriers are supplied in packs of two, complete with an Allen key for assembly.
1. Mark out the position of the sockets. Normal spacing is approx' 2.5mtrs between posts,
but this can be increased to 3mtrs on occasion, so long as the tension on the cord is sufficient to maintain a straight and level line.
2. Drill the holes in the floor surface using an appropriate masonry drill to produce a clean lipped hole 28mm to 30mm dia' and approx' 73mm deep and clear the hole of any dust or debris.
3. Tighten each upright firmly into its socket.
4. To get the best from this equipment we recommend installing the sockets with the uprights inserted to ensure the cord slots at the top of the post are correctly aligned.
5. Apply an epoxy resin to the base and sides of the hole and insert the socket, being sure to bed it down' by using small backwards and forwards rotational motions to assist the movement of the resin.
6. If required carefully apply additional resin to any gap at the top of the socket to ensure that the finish is flush with the floor and clean off any excess resin that squeezes out.
7. Use a spirit level to check that the upright it is absolutely vertical, and if necessary support in this position whilst the resin cures.
Then, when the resin is cured, for PPC barriers, follow these guidelines...
8. Remove the top caps using your finger or a small screwdriver and tie a simple granny'
knot in the end of the elasticated cord. Pull it very tight and cut off any excess cord close to the knot.
9. Push the knot into the recess in the top of the upright with the cord exiting through one of the slots and replace the cap.
10. Pull the cord tight to the next barrier with enough tension to make a straight line and push into the slots: straight across if it is a straight line or at right angles if it is at a corner.
11. Repeat step 9 for the last barrier or use a wall terminator.
Note: In an installation where the object is completely surrounded, instead of two separate knots tie the two ends together with a reef knot, pull very tight and cut off the ends. If required, cut off one of the cap legs to accommodate the size of this knot.
A line of barriers can also end with the cord returning to the wall by using a wall terminator.

Dans la boutique



Absolute Art Hanging Track Explainer
Absolute Art Hanging Track Explainer
26/08/2024 - www.absoluteproduct.com
A RT H A NG I N G TRAC K EXP LA INED ST E P 1: A SSE SSIN G T HE INSTAL L AT ION S ETTING Before you can select a track (rail), you need a clear picture of the installation setting. You can use Important: No matter the material strength of the art hanging track, it must rely on the structure of the below as a checklist and send it back to us for tailored advice, or you can compare your list to the wall to stay in place. To safeguard valuable artworks, know what's in the wall or ceiling. the...

Floor Socket Barrier
Floor Socket Barrier
26/08/2024 - www.absoluteproduct.com
Instructions - Floor Socket Barrier Barriers are supplied in packs of two, complete with an Allen key for assembly. 1. Mark out the position of the sockets. Normal spacing is approx' 2.5mtrs between posts, but this can be increased to 3mtrs on occasion, so long as the tension on the cord is sufficient to maintain a straight and level line. 2. Drill the holes in the floor surface using an appropriate masonry drill to produce a clean lipped hole 28mm to 30mm dia' and approx' 73mm deep and clear the...
 

Dpc8201 3 Poutre Poteaux Grauhlet 07 2017
Dpc8201 3 Poutre Poteaux Grauhlet 07 2017
02/07/2024 - www.kp1.fr
0679 09 0679-CPR-0247 DOCUMENT D'ACCOMPAGNEMENT ET DECLARATION DES PERFORMANCES N°8201-3 1.CODE D'IDENTIFICATION UNIQUE DU PRODUIT TYPE ELEMENT DE STRUCTURE LINEAIRE EN BETON : POUTRE / POTEAU I et R 2. NUMERO PERMETTANT L'IDENTIFICATION DU PRODUIT DE CONSTRUCTION 3. USAGE PREVU DU PRODUIT DE CONSTRUCTION, CONFORMEMENT A LA SPECIFICATION TECHNIQUE HARMONISEE APPLICABLE Poutre/ Poteau I et R Béton Précontraint  Voir étiquette produit Planchers et ossatures en béton 4. NOM, RAISON SOCIALE...

Accessoires Glissières - Tertu
Accessoires Glissières - Tertu
17/10/2016 - www.tertu.com
ð„ Expertise - Mars 2013 Accessoires Glissières ð„ Raccord sur muret ou GBA Une expertise internationale ð„ Raccord T40 sur profil A Pièce métallique de raccordement entre la glissière mixte bois-métal T40 et la glissière métallique profil A.­­­ Dans le cadre de son développement international, Tertu est fréquemment confronté à des situations particulières nécessitant un traitement adapté. Un précieux vécu qui a forgé l expertise de Tertu et renforcé sa capacité...


Photometrics data (PDF)
Photometrics data (PDF)
27/10/2010 - www.agabekov.com
Luminaire Code LU2X 3W CL Name LU2X-1000 IP20 17x12V3W CL Line AGABEKOV Efficiency 52.80% 169.64 cd/klm Length Length 0.035000 m2 0.020000 m2 0.000700 m2 Asymmetrical 8.70 Measurement Code CLF1414/05-08I Name LU2X-1000IP20 17X12V5WCLEAR Date 23-03-2005 Coordinate system C-G Position 1000 mm 1000 mm Width Width 38 mm 35 mm Lamp Code Number Position Total Flux C=195.00 G=5.00 Height Height XENON 3W CL 12V 17 530.74 lm Maximum value Rectangular Luminaire Rectangular Luminous Area Horizontal Luminous...

Solutions Outdoor de Profils Syst?mes : A chaque ext?rieur son ?quipement id?al !
Solutions Outdoor de Profils Syst?mes : A chaque ext?rieur son ?quipement id?al !
30/03/2025 - www.n-schilling.com
Résumé en cours de création pour ce fichier PDF


16/02/2025 - www.farrow-ball.com
Résumé en cours de création pour ce fichier PDF