MPLC3-v00-EN
PLC3 Evaporative Condensers
OPERATING AND MAINTENANCE INSTRUCTIONS
Recommended maintenance and monitoring programme
Baltimore Aircoil Company equipment needs to be properly installed, operated and maintained. Documentation of the equipment used, including a drawing, technical data sheet and this manual should be kept on record. To achieve long, trouble-free and safe operation, it is necessary to establish an operating plan including a programme of regular inspection, monitoring and maintenance. All inspections, maintenance and monitoring actions should be recorded in a cooling system logbook. The operating and maintenance instructions published here can be used as a guide to achieve these goals.
In addition to establishing the operating plan and the cooling system logbook it is recommended to conduct a cooling system risk analysis, preferably by an independent third party.
For the cooling system, scale, corrosion and biological control must be established and initiated when the system is first filled with water and administered on a regular basis thereafter in accordance with recognized
Codes of Practice, (such as EUROVENT 9 - 5/6, ACOP HSC L8, Guide des bonnes pratiques, Legionella et tours aéroréfrigérantes, etc.). Water sampling, test results and corrective actions should be recorded in the cooling system logbook.
For more specific recommendations on keeping your cooling system efficient and safe, contact your local BAC
service provider or representative. Name, e-mail and phone number can be found on the website www.BACService.eu.
Checks and adjustments
Start-Up
Weekly
Monthly
Quarterly
Every 6
Annually
Shutdown
months
Cold water basin & strainer
X
X
Water wall
Operating level and make-up