HowToStainEntryTear

Extrait du fichier (au format texte) :

HOW TO STAIN FIBERGLASS ENTRY SYSTEMS
IMPORTANT

Please read and understand the entire staining procedure before attempting to finish the door.
Be sure to follow the paint manufacturers detailed application instructions on the product label.

1. HOW TO START

Doors can be stained either hanging in the opening or removed from the frame
(recommended). Should you remove the door, take care to protect it from damage.
Sidelites will need to be finished vertically. To remove the door from the frame, use a center punch and hammer. Strike the hinge pin from the bottom until it pops up (for outswing units  hinge leaf must be removed from the door). Drive the hinge pin as far as possible with the punch. Using a pair of pliers, grasp the hinge pin and, while twisting, pull the pin out. Remove all door hardware.

2. MATERIAL REQUIRED

Find a well-lit staining location that is dust-free, well ventilated and within the climate conditions recommended by the stain/top-coat manufacturer.
Coatings and accessories:
n Mineral spirits n Lint-free rags or cheese cloth (recommended)
n 2" wide foam brush n Safety razor blades n One pair of rubber gloves n Stir sticks n Masking tape n Stain
 High-quality, opaque (non-transparent), heavily pigmented, oil-based stain
(recommended)
 Gel stains can also be used
 Semi-transparent stains are not recommended n High-quality, exterior grade, UV stabilized polyurethane sealant (satin or low gloss)
n 2-1/2"  wide china bristle brush
Tools:
n Hammer  n Center punch  n Safety glasses  n Phillips screwdriver  n Pliers

3. PREPARING THE DOOR SURFACE

IMPORTANT: Dust, debris and other surface contaminants can accumulate on the surface of the door. Therefore, to achieve best results and maximum coating adhesion, wipe/
clean all surfaces of the door panel(s) and sidelite(s) thoroughly with mineral spirits. Allow the surface to dr completely  until there is no residual odor. Mask (tape) off all surfaces that will not be stained.

4. STAINING THE DOOR
Use a high quality, heavily pigmented, oil-based stain (recommended). Gel stains can also be used. Before starting, and occasionally throughout the project, stir the stain until the texture is creamy. We recommend that before starting, you try staining a small

Dans la boutique



Patio Door Install
Patio Door Install
09/04/2011 - www.masonite.com
INSTALLATION INSTRUCTIONS FOR PATIO DOORS IMPORTANT: Read and understand the entire procedure before attempting to install the unit. Please note that this is a supplemental instruction. Installation instructions will also be attached to the purchased unit. NOTE: Some dwelling designs/conditions may require special installation steps. Consult an architect, design professional and/or code official for additional guidance. CAUTION: Wear safety glasses and gloves when installing the patio unit. Unit...

HowToStainEntryTear
HowToStainEntryTear
09/04/2011 - www.masonite.com
HOW TO STAIN FIBERGLASS ENTRY SYSTEMS IMPORTANT Please read and understand the entire staining procedure before attempting to finish the door. Be sure to follow the paint manufacturers detailed application instructions on the product label. 1. HOW TO START Doors can be stained either hanging in the opening or removed from the frame (recommended). Should you remove the door, take care to protect it from damage. Sidelites will need to be finished vertically. To remove the door from the frame, use...

Interior Prehung Doors
Interior Prehung Doors
09/04/2011 - www.masonite.com
INSTALLATION INSTRUCTIONS FOR INTERIOR PREHUNG DOORS Before you begin Remove the packaging and take the following precautions with the door: 1. Prehung interior doors can be installed immediately. If you are not installing immediately, store your door flat on a level surface, in a clean, dry, well-ventilated area. 2. Avoid excessive warping or drying. Do not store or install your prehung door in a damp, or freshly dry-walled building. Keep the door at least 10 feet away from heating registers, and...

Entry Door Install
Entry Door Install
09/04/2011 - www.masonite.com
SIDE-HINGED DOOR UNIT INSTALLATION INSTRUCTIONS Some dwelling designs/conditions may require special installation steps, consult your architect, design professional and/or product manufacturer for additional guidance. Step 1: Prepare Rough Opening Step 3: Prepare Door Unit Remove all packaging materials such as nails, staples and screws. Step 4: Place Door in Rough Opening Side-Hinged Door Types Instructions vary according to door type. Confirm which door type is being installed. some door styles...
 

Comment gérer la mutualisation des ressources dans les ... - Horoquartz
Comment gérer la mutualisation des ressources dans les ... - Horoquartz
12/04/2017 - www.horoquartz.fr
12.02.2015  Mutualisation des ressources CoTer Comment gérer la mutualisation des ressources dans les Collectivités Territoriales (COTER) Les lois sur la décentralisation ont amené l état à transférer un certain nombre de missions auprès des collectivités territoriales. Pour faire face à ces nouvelles obligations, les communes se sont regroupées en EPCI, Etablissement Public de Coopération Intercommunale, afin de développer à plusieurs les compétences et acquérir les moyens manquants,...

Pelle compacte Gamme de Produit
Pelle compacte Gamme de Produit
01/12/2010 - www.bobcat.eu
Pelles compactes Gamme de produits Creusez plus profond et profitez des avantages Bobcat ! n Des engins compacts à la pointe du progrès Quelle que soit la pelle compacte que vous choisirez, elle facilitera considérablement vos travaux de construction, de démolition ou encore d aménagement paysager. Des micro-pelles de moins d une tonne aux modèles midi de 12,5 tonnes, nos machines offrent des performances imbattables à un coût raisonnable. Il vous faut des machines fiables, demandant...

Gypse : “double poteau espacé” remplis. sous main-cour. ronde ...
Gypse : “double poteau espacé” remplis. sous main-cour. ronde ...
13/02/2012 - www.technal.fr
Gypse : "double poteau espacé" remplis. sous main-cour. ronde entre tableau (BY) 12/05 02 - 1.11 50 - Applications : 46 droit entre tableau, remplissage sous main-courante ronde 100 - Elévation, échelle 1/20 : 1-B 1-A 1024 · lieu public : 1550 mm maxi. · lieu privé : 1800 mm maxi. 20 - Coupes, échelle 1/2 : 80 26,5 15 50 75 90 48,5 Coupe horizontale 1-A Coupe verticale 1-B s les garde-corp

Grand Road Show de Beissier : Bagar Airliss en tournée dans toute la France !
Grand Road Show de Beissier : Bagar Airliss en tournée dans toute la France !
25/11/2010 - www.n-schilling.com
Communiqué de presse mars 2007 Grand Road Show de Beissier : Bagar Airliss en tournée dans toute la France ! Beissier, leader sur le marché des enduits mécanisés, développe depuis des années des solutions performantes réservées à l'usage des professionnels du bâtiment. Bagar Airliss, gamme d'enduits de lissage et de finition pour projection mécanisée airless, vise à améliorer la rapidité de mise en oeuvre, la productivité et le confort du travail d'application... pour un résultat...

TLFSAL B 3 6 10 F
TLFSAL B 3 6 10 F
27/10/2010 - www.agabekov-lighting.com
18 LumINAIRE DOuBLE LINEAIRE FLEX AGA-LED® AGA-LED® TWIN LINEAR FLEX LEUCHTE TWIN AGA-LED®FLEX LINEAR LUMINAIRE TLFSAL IP20 AGA-LED® B-3, B-6 OR B-10 FESTOON CONNECTOR Photo : TLFSAL IP20 with AGA-LED® B-10 lighting unit festoon connector / 24V / 1W 14 mm 26 mm 9 mm 5 mm AGA-LED® B-10 festoon connector 2800K, 5000K / 60'000h Luminaire linéaire basse tension à courant stabilisé utilisant des unités lumineuses AGA-LED® B-3, B-6 ou B-10 selon affectation page suivante. Compris dans...


15/10/2024 - www.dow.com
Résumé en cours de création pour ce fichier PDF