SIDE-HINGED DOOR UNIT INSTALLATION INSTRUCTIONS
Some dwelling designs/conditions may require special installation steps, consult your architect, design professional and/or product manufacturer for additional guidance.

Step 1: Prepare Rough Opening

Step 3: Prepare Door Unit
Remove all packaging materials such as nails, staples and screws.

Step 4: Place Door in Rough Opening

Side-Hinged Door Types
Instructions vary according to door type. Confirm which door type is being installed. some door styles not available in all markets. For single door unit, use Step 5A. For double door unit, use Step 5B. For single door unit with one or two sidelites, use Step 5C.

Information Panel

How to Plumb the Door
For all door types, it is essential that the frame is in a straight vertical plane and is not twisted. Check alignment using this method: Stand on the outside of the door. Check that the weatherstripping on the latch side is evenly compressed along the entire height of the door slab without any pinching or gaps (Figures 9 and 10). DO NOT utilize the wall to square and level unit. Unit must be square and level to insure proper operation and performance.

Required Tools & Materials

Do not remove the plastic skid plate because it allows the door to slide easily and acts as a rot and moisture barrier (Figure 3).

Figure 1: A clean, level, solid sub-floor area is essential to successful installation.

A:

Ensure that the following conditions are met: Clean, clear work area · The rough opening (RO) is ideally 1" wider and 1/2" taller than the outside frame dimensions of the door unit. Units intended for installation in high velocity windstorm markets require less clearance between unit and RO (1/4" sides & top). · The RO is plumb, square and level · The old door frame has been completely removed in retro-fit installation · The sub-floor area is clean, dry and level · The existing sub-floor area is at least 6" deep for 4-9/16" frames and at least 8" deep for 6-9/16" frames. Because a solid, level sub-floor is absolutely essential for proper door unit installation, do not proceed with the installation until the sub-floor is both solid and level.

single door
(X for operable panel or O for non-operable panel)

Figure 3: Some door units may be supplied with a plastic skid plate located along the bottom of the door. Do not remove. Figure 6: Place the sill in the opening first and then tilt the door up into the opening.

B:

Door units featuring multiple door panels or glass inserts are heavier and more difficult to handle - do not attempt to handle without assistance.

double door
(XX for unit featuring two operable panels)

Step 2: Caulk the Sub-Floor
C:

Figures 9 and 10: The weatherstripping on these doors is not evenly compressed.

How to Fasten the Door
After shimming, the door is fastened to the studs by installing screws through the jambs, shims and into the stud (Figure 11).

Dans la boutique



Patio Door Install
Patio Door Install
09/04/2011 - www.masonite.com
INSTALLATION INSTRUCTIONS FOR PATIO DOORS IMPORTANT: Read and understand the entire procedure before attempting to install the unit. Please note that this is a supplemental instruction. Installation instructions will also be attached to the purchased unit. NOTE: Some dwelling designs/conditions may require special installation steps. Consult an architect, design professional and/or code official for additional guidance. CAUTION: Wear safety glasses and gloves when installing the patio unit. Unit...

Interior Prehung Doors
Interior Prehung Doors
09/04/2011 - www.masonite.com
INSTALLATION INSTRUCTIONS FOR INTERIOR PREHUNG DOORS Before you begin Remove the packaging and take the following precautions with the door: 1. Prehung interior doors can be installed immediately. If you are not installing immediately, store your door flat on a level surface, in a clean, dry, well-ventilated area. 2. Avoid excessive warping or drying. Do not store or install your prehung door in a damp, or freshly dry-walled building. Keep the door at least 10 feet away from heating registers, and...

Entry Door Install
Entry Door Install
09/04/2011 - www.masonite.com
SIDE-HINGED DOOR UNIT INSTALLATION INSTRUCTIONS Some dwelling designs/conditions may require special installation steps, consult your architect, design professional and/or product manufacturer for additional guidance. Step 1: Prepare Rough Opening Step 3: Prepare Door Unit Remove all packaging materials such as nails, staples and screws. Step 4: Place Door in Rough Opening Side-Hinged Door Types Instructions vary according to door type. Confirm which door type is being installed. some door styles...

HowToStainEntryTear
HowToStainEntryTear
09/04/2011 - www.masonite.com
HOW TO STAIN FIBERGLASS ENTRY SYSTEMS IMPORTANT Please read and understand the entire staining procedure before attempting to finish the door. Be sure to follow the paint manufacturers detailed application instructions on the product label. 1. HOW TO START Doors can be stained either hanging in the opening or removed from the frame (recommended). Should you remove the door, take care to protect it from damage. Sidelites will need to be finished vertically. To remove the door from the frame, use...
 


08/10/2024 - www.ondex.com
Résumé en cours de création pour ce fichier PDF

SCB
SCB
10/03/2012 - kaufelfr.tnb.com
SOURCE CENTRALE A COURANT CONTINU POUR ECLAIRAGE DE SECURITE SCB 110 / 660 1 - PRESENTATION MODELE Désignation : SCB 110 / 660 : Alimentation à courant continu pour éclairage de sécurité : Permanent Photo non contractuelle Type Conformité : Source centrale conforme à la norme NFC 71 815 Tableau de bord conforme à l'article EL 15 2 - CARACTERISTIQUES TECHNIQUES GENERALES Caractéristiques électriques Utilisation Tension Tolérance de régulation Puissance Autonomie Alimentation Tension...


28/09/2024 - www.vescom.com
Résumé en cours de création pour ce fichier PDF

Nouvelles collections Parquets et Stratifiés du Comptoir Seigneurie Gauthier
Nouvelles collections Parquets et Stratifiés du Comptoir Seigneurie Gauthier
25/11/2010 - www.n-schilling.com
Nouvelles collections Parquets et Stratifiés du Comptoir Seigneurie Gauthier COMMUNIQUÉ DE PRESSE / décembre 2009 Les nouvelles collections de parquets Esprit Bois et de sols strati és Edilam Bâtiment de la marque Studio jouent les nouvelles stars dans le réseau Le Comptoir Seigneurie Gauthier. Placées sous le signe de la modernité et de l'excellence, ces deux nouvelles gammes dédiées au marché du résidentiel, de l'hôtellerie et des magasins, renouvellent la force de proposition des...

MALAXEUR PORTATIF 1000W Ø 120 MM
MALAXEUR PORTATIF 1000W Ø 120 MM
29/12/2010 - www.loxam.fr
7237 7238 INTERDICTIONS · Ne pas utiliser d'outils non conçus pour cet appareil. · Ne pas utiliser de pale surdimensionnée · Ne pas malaxer d'autres produits que ceux préconisés. · Ne pas malaxer des produits pouvant éventuellement contenir des solvants explosifs · Ne pas utiliser l'appareil pour des opérations autres que le malaxage. SÉCURITÉ LIÉE À L'ENVIRONNEMENT · Le champ de travail doit être parfaitement dégagé, bien éclairé et ne présenter aucun risque. · Ne pas utiliser...

Equipement d'une salle de sport : les différentes étapes 18h15 ...
Equipement d'une salle de sport : les différentes étapes 18h15 ...
12/03/2012 - www.a2s.fr
Equipement d'une salle de sport : les différentes étapes 18h15 : Salle de sports prête pour la mise en place. Arrivée des dalles sur chariots. Pose des Dalles Géantes jointivement sur le parquet sans colle ni adhésifs, 4 hommes couvrent 1000 m² en 1h30. Installation des structures d'accueil (ring, estrades, chaises...) 20h00 : La salle est prête pour recevoir le piètinement des chaussures de ville et autres maltraitances. Gymnasium equipment : installation procedure 6:15 p.m. : Gymnasium...