Entry Door Install

Extrait du fichier (au format texte) :

SIDE-HINGED DOOR UNIT INSTALLATION INSTRUCTIONS
Some dwelling designs/conditions may require special installation steps, consult your architect, design professional and/or product manufacturer for additional guidance.

Step 1: Prepare Rough Opening

Step 3: Prepare Door Unit
Remove all packaging materials such as nails, staples and screws.

Step 4: Place Door in Rough Opening

Side-Hinged Door Types
Instructions vary according to door type. Confirm which door type is being installed. some door styles not available in all markets. For single door unit, use Step 5A. For double door unit, use Step 5B. For single door unit with one or two sidelites, use Step 5C.

Information Panel

How to Plumb the Door
For all door types, it is essential that the frame is in a straight vertical plane and is not twisted. Check alignment using this method: Stand on the outside of the door. Check that the weatherstripping on the latch side is evenly compressed along the entire height of the door slab without any pinching or gaps (Figures 9 and 10). DO NOT utilize the wall to square and level unit. Unit must be square and level to insure proper operation and performance.

Required Tools & Materials

Do not remove the plastic skid plate because it allows the door to slide easily and acts as a rot and moisture barrier (Figure 3).

Figure 1: A clean, level, solid sub-floor area is essential to successful installation.

A:

Ensure that the following conditions are met: Clean, clear work area · The rough opening (RO) is ideally 1" wider and 1/2" taller than the outside frame dimensions of the door unit. Units intended for installation in high velocity windstorm markets require less clearance between unit and RO (1/4" sides & top). · The RO is plumb, square and level · The old door frame has been completely removed in retro-fit installation · The sub-floor area is clean, dry and level · The existing sub-floor area is at least 6" deep for 4-9/16" frames and at least 8" deep for 6-9/16" frames. Because a solid, level sub-floor is absolutely essential for proper door unit installation, do not proceed with the installation until the sub-floor is both solid and level.

single door
(X for operable panel or O for non-operable panel)

Figure 3: Some door units may be supplied with a plastic skid plate located along the bottom of the door. Do not remove. Figure 6: Place the sill in the opening first and then tilt the door up into the opening.

B:

Door units featuring multiple door panels or glass inserts are heavier and more difficult to handle - do not attempt to handle without assistance.

double door
(XX for unit featuring two operable panels)

Step 2: Caulk the Sub-Floor
C:

Figures 9 and 10: The weatherstripping on these doors is not evenly compressed.

How to Fasten the Door
After shimming, the door is fastened to the studs by installing screws through the jambs, shims and into the stud (Figure 11).

Dans la boutique



Entry Door Install
Entry Door Install
09/04/2011 - www.masonite.com
SIDE-HINGED DOOR UNIT INSTALLATION INSTRUCTIONS Some dwelling designs/conditions may require special installation steps, consult your architect, design professional and/or product manufacturer for additional guidance. Step 1: Prepare Rough Opening Step 3: Prepare Door Unit Remove all packaging materials such as nails, staples and screws. Step 4: Place Door in Rough Opening Side-Hinged Door Types Instructions vary according to door type. Confirm which door type is being installed. some door styles...

Interior Prehung Doors
Interior Prehung Doors
09/04/2011 - www.masonite.com
INSTALLATION INSTRUCTIONS FOR INTERIOR PREHUNG DOORS Before you begin Remove the packaging and take the following precautions with the door: 1. Prehung interior doors can be installed immediately. If you are not installing immediately, store your door flat on a level surface, in a clean, dry, well-ventilated area. 2. Avoid excessive warping or drying. Do not store or install your prehung door in a damp, or freshly dry-walled building. Keep the door at least 10 feet away from heating registers, and...

HowToStainEntryTear
HowToStainEntryTear
09/04/2011 - www.masonite.com
HOW TO STAIN FIBERGLASS ENTRY SYSTEMS IMPORTANT Please read and understand the entire staining procedure before attempting to finish the door. Be sure to follow the paint manufacturers detailed application instructions on the product label. 1. HOW TO START Doors can be stained either hanging in the opening or removed from the frame (recommended). Should you remove the door, take care to protect it from damage. Sidelites will need to be finished vertically. To remove the door from the frame, use...

Patio Door Install
Patio Door Install
09/04/2011 - www.masonite.com
INSTALLATION INSTRUCTIONS FOR PATIO DOORS IMPORTANT: Read and understand the entire procedure before attempting to install the unit. Please note that this is a supplemental instruction. Installation instructions will also be attached to the purchased unit. NOTE: Some dwelling designs/conditions may require special installation steps. Consult an architect, design professional and/or code official for additional guidance. CAUTION: Wear safety glasses and gloves when installing the patio unit. Unit...
 

NOTICE BRIO ECO3 ET 60L A-A3:Mise en page 1
NOTICE BRIO ECO3 ET 60L A-A3:Mise en page 1
10/03/2012 - kaufelfr.tnb.com
NOTICE D'UTILISATION 141NTC137-IND00 7 - MAINTENANCE BLOC A TECHNOLOGIE AUTOTESTABLE L'article EC 14 du règlement de sécurité impose une vérification périodique des installations d'éclairage de sécurité par l'exploitant. Une maintenance annuelle doit être réalisée par une personne qualifiée et toutes anomalies doivent être corrigées rapidement (NFC 71-830). De plus, elles doivent être consignées dans un registre de sécurité. Cet appareil effectue automatiquement les tests périodiques...

14446 fr
14446 fr
09/04/2011 - www.tisserant.fr
Ref : 14446 H : 92 cm Ø : 78 cm Bras : 8 Lustre Directoire Bronze finition dorure 24 K


18/12/2024 - www.legrand.fr
Résumé en cours de création pour ce fichier PDF

Conditions de vente d'Outokumpu Version : 05/12/2013
Conditions de vente d'Outokumpu Version : 05/12/2013
30/05/2016 - www.outokumpu.com
Conditions de vente d'Outokumpu Version : 05/12/2013 1 Introduction Les présentes conditions de vente (« Conditions ») font partie intégrante de toutes les offres et tous les contrats de vente de marchandises d'Outokumpu (« Marchandises »). La validité des modifications des Conditions est soumise à l approbation écrite d'Outokumpu. Toute condition spécifiée par l'Acheteur dans sa commande ou d une autre façon est exclue et ne peut prendre effet qu'après approbation écrite d Outokumpu....

Fenêtre GIL pour verrière plane - Velux
Fenêtre GIL pour verrière plane - Velux
31/10/2016 - www.velux.fr
Fenêtre GIL pour verrière plane La fenêtre fixe pour verrière plane Descriptif type S installe en partie basse d une fenêtre de toit (GGL ou GPL) de même largeur pour une vue exceptionnelle vers l extérieur. Adapté aux combles classiques dont le toit descend jusqu au plancher. " Finition bois. Qualité de finition et procédé de traitement spécial durabilité  exclusif VELUX (5 étapes de traitement). " Fenêtre garde -corps. " Niveau de performances Tout Confort. Dormants GIL Tout...

Regent Lighting Booklet TRAQ 2022 EN
Regent Lighting Booklet TRAQ 2022 EN
12/09/2024 - www.regent.ch
TRAQ Quality with a system P E O P L E L I G H T O U R W A Y TRAQ Quality with a system High efficiency, high flexibility and long service life all along the line: TRAQ is our highest-quality continuous-row lighting system and is characterised, among other things, by its extremely simple, tool-free installation. In addition, the trendsetting optics developed especially for TRAQ provide particularly uniform, glare-free light with first-class colour rendition. With no less than five available...