Interior Prehung Doors

Extrait du fichier (au format texte) :

INSTALLATION INSTRUCTIONS FOR INTERIOR PREHUNG DOORS
Before you begin
Remove the packaging and take the following precautions with the door: 1. Prehung interior doors can be installed immediately. If you are not installing immediately, store your door flat on a level surface, in a clean, dry, well-ventilated area. 2. Avoid excessive warping or drying. Do not store or install your prehung door in a damp, or freshly dry-walled building. Keep the door at least 10 feet away from heating registers, and away from direct sunlight. 3. Handle your prehung door with clean hands or gloves, and lift rather than drag it. The precautions you take now will make finishing and installation much easier later. (Consult your retailer for information on finishing instructions.)

Cross section of a typical door installation
All parts are seen in position in this horizontal section drawing. Note that the hinge pin protrudes about 1/8" beyond the door; there are both left-hand and right-hand hinges for doors that open from either the left or the right. Doorstops fit snugly against the closed door (they are installed with the door in the closed position). The casing is set back slightly from the edge of the jamb to allow removal of the hinge pin. The leading edge of the door is beveled to give the door clearance to swing without leaving a visible gap between the closed door and the jamb on the outside. Prehung doors come hinged to their jambs.

Flat Jamb
Casing One Piece Flat Jamb Stop Door Casing Two Piece Split Jamb

Split Jamb

Door

STUD ROUGH OPENING (R.O.) ALLOWANCES
UNIT DIMENSIONS R.O. WIDTH R.O. HEIGHT

Tools Required
All you need is a hammer, Phillips screwdriver, 24" level, 24" framing square, nail set, wooden shims, 8d and 16d finish nails, putty knife and wood filler.

Step 1. Rough Opening
Before you start, check to make sure that the rough opening is 1/2" wider than the unit width & 1/2" higher than the unit height. This will allow you to shim and square the door frame easily. Door casing will cover the gap between the rough opening & the door frame.

18" - 19-1/2" x 81-1/2" 20" - 21-1/2" x 81-1/2" 24" - 25-1/2" x 81-1/2" 28" - 29-1/2" x 81-1/2" 30" - 31-1/2" x 81-1/2" 32" - 33-1/2" x 81-1/2" 36" - 37-1/2" x 81-1/2"

20" 22" 26" 30" 32" 34" 38"

82" 82" 82" 82" 82" 82" 82"

Step 2. Determine Door Swing Required

Step 3. Square and Plumb Rough Stud Opening

Step 4. Install Pre-Hung Unit Into Rough Opening

Left Hand Door

As viewed from the Interior

Right Hand Door

When the door opens to you, and the knob is on the left, it is a left hand door.

When the door opens to you, and the knob is on the right, it is a right hand door.

Make sure: 1. The threshold is level 2. The hinge side of the rough opening is plumb 3. The head is square to the hinge side of the rough opening

Center the prehung unit into the rough opening, bottom first.

Step 5. Nail Hinge Side of Frame

Dans la boutique



Patio Door Install
Patio Door Install
09/04/2011 - www.masonite.com
INSTALLATION INSTRUCTIONS FOR PATIO DOORS IMPORTANT: Read and understand the entire procedure before attempting to install the unit. Please note that this is a supplemental instruction. Installation instructions will also be attached to the purchased unit. NOTE: Some dwelling designs/conditions may require special installation steps. Consult an architect, design professional and/or code official for additional guidance. CAUTION: Wear safety glasses and gloves when installing the patio unit. Unit...

HowToStainEntryTear
HowToStainEntryTear
09/04/2011 - www.masonite.com
HOW TO STAIN FIBERGLASS ENTRY SYSTEMS IMPORTANT Please read and understand the entire staining procedure before attempting to finish the door. Be sure to follow the paint manufacturers detailed application instructions on the product label. 1. HOW TO START Doors can be stained either hanging in the opening or removed from the frame (recommended). Should you remove the door, take care to protect it from damage. Sidelites will need to be finished vertically. To remove the door from the frame, use...

Interior Prehung Doors
Interior Prehung Doors
09/04/2011 - www.masonite.com
INSTALLATION INSTRUCTIONS FOR INTERIOR PREHUNG DOORS Before you begin Remove the packaging and take the following precautions with the door: 1. Prehung interior doors can be installed immediately. If you are not installing immediately, store your door flat on a level surface, in a clean, dry, well-ventilated area. 2. Avoid excessive warping or drying. Do not store or install your prehung door in a damp, or freshly dry-walled building. Keep the door at least 10 feet away from heating registers, and...

Entry Door Install
Entry Door Install
09/04/2011 - www.masonite.com
SIDE-HINGED DOOR UNIT INSTALLATION INSTRUCTIONS Some dwelling designs/conditions may require special installation steps, consult your architect, design professional and/or product manufacturer for additional guidance. Step 1: Prepare Rough Opening Step 3: Prepare Door Unit Remove all packaging materials such as nails, staples and screws. Step 4: Place Door in Rough Opening Side-Hinged Door Types Instructions vary according to door type. Confirm which door type is being installed. some door styles...
 


28/09/2024 - www.prandelli.com
Résumé en cours de création pour ce fichier PDF

Zehnder ComfoKit : nouvelle offre de solutions de ventilation double flux clé en main
Zehnder ComfoKit : nouvelle offre de solutions de ventilation double flux clé en main
18/04/2017 - www.andresudrie.com
Information Presse | Avril 2017 ð< Radiateurs décoratifs ð< Ventilation double-flux ð< Plafonds chauffants et rafraîchissants ð< Clean Air Solutions Zehnder ComfoKit : Nouvelle offre de solutions de ventilation double flux clé en main Pour répondre facilement à de nombreux projets de ventilation double fux en logement, Zehnder renouvelle son offre de solutions clé en main ComfoKit avec : . ComfoKit Zehnder ComfoAir 180 pour petits logements (T1 à T3), . ComfoKit Zehnder...

M i c r o s o f t W o r d - P E P B R I O + L S C  I P 4 2 . d o c
M i c r o s o f t W o r d - P E P B R I O + L S C I P 4 2 . d o c
10/03/2012 - kaufelfr.tnb.com
Profil Environnemental Produit Bloc autonome d'éclairage de sécurité Ce document répond aux exigences de la norme NF ISO 14 020 établissant les principes directeurs pour le développement et déclarations environnementales ainsi qu'à celle de la norme ISO 14 025 établissant les principes et les procédures de développement de déclarations environnementales de type III. Mise à jour : 24 août 2010 1. Description du produit Référence : 497 701 & 490 701 Identification du produit : BRIO...

Italcementi et Alessi lancent “#Béton et Design”, un concours dédié à tous les designers passionnés par la recherche et l’expérimentation
Italcementi et Alessi lancent “#Béton et Design”, un concours dédié à tous les designers passionnés par la recherche et l’expérimentation
21/11/2013 - www.n-schilling.com
Communiqué de presse novembre 2013 Italcementi et Alessi lancent #Béton et Design , un concours dédié à tous les designers passionnés par la recherche et l expérimentation Italcementi, acteur reconnu dans le domaine de l innovation des matériaux de construction et Alessi, un des leaders de l «Italian Design Factories Companies », s associent pour le lancement de « #Béton et Design ». Ce concours international s adresse aux jeunes créateurs à la recherche de nouvelles formes...


16/02/2025 - www.farrow-ball.com
Résumé en cours de création pour ce fichier PDF

Fpr Pe Select 46 Tubfr 2072 B
Fpr Pe Select 46 Tubfr 2072 B
23/08/2024 - www.tubauto.fr
FICHE PRODUIT Porte d'entrée - Select 46 Porte d'entrée élégante et moderne en acier et aluminium, en dimensions standards et sur-mesure Hautes performances techniques : Isolation thermique optimale jusqu'à 1,1 W/m².K. Double ou triple vitrage selon motif. Etanchéité parfaite grâce à sa double ligne de joints. Sécurité face aux tentatives d'intrusion : Serrure automatique à rouleaux à verrouillage 5 pênes. Dispositif d'anti-dégondage. Classement retardateur d'effraction CR2,...